PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This issued; description: we are looking to a electrical permit covers Boulder, CO permit… in Boulder, filed July 31, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 4 records on Spine Road from Aug 11, 2025 through Aug 11, 2026, including 4 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 11, 2025 through Aug 11, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 229% vs prior 30 days711 permits vs 216 · through Aug 7, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JULY 31, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Issued; Description: We are looking to add a temp power for
  2. JUL 16, 2026

    Boulder, CO permit fcb33416-3d46-4409-b605-45aa212392f6: Construction/Sales or Relocatable Building Permit

    permit · Unclassified · Issued; Description: we would like to set a construction trailer 12'x48' in size on the property during course of constr
  3. JUL 10, 2026

    Boulder, CO permit 0409b6ea-fbb0-41d0-b055-bab3ac6ca611: Right-of-Way Permit

    permit · Unclassified · Issued; Description: Installation of wet utilities associated with Sequence A, Sequence B, and Master TEC-DOCS for the C · $10,000