Boulder, CO permit…
This issued; description: rafter upgrade - si solar permit covers Boulder, CO permit… in Boulder, filed July 29, 2026, with an estimated value of $3,315.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 4 records on Chase Court from Aug 11, 2025 through Aug 11, 2026, including 4 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 11, 2025 through Aug 11, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Solar work with Roofers (pre-install inspect), Battery/backup, EV charger, Electricians as common follow-on categories.
- Roofers (pre-install inspect)
- Battery/backup
- EV charger
- Electricians
RECORD ACTIVITY
Activity timeline
-
JUL 29, 2026
Boulder, CO permit 5e050f48-ed0f-40f0-877a-6f055639f3d7: Electrical Permit
permit · Solar · Issued; Description: Solar and ESS installation with service upgrade to 200A SYSTEM SIZE: 9 · $64,025 -
JULY 29, 2026
Boulder, CO permit… This permit
Permit · Solar · Issued; Description: Rafter upgrade - sistering for supporti · $3,315 -
JUL 20, 2026
Boulder, CO permit 64c66211-1a7f-4f41-942e-206abc7bec96: Mechanical Permit
permit · HVAC · Issued; Description: Installation of a 3 TON dual fuel system for single family dwelling - includes electrical 40A Break · $25,250