PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This issued; description: ***7/2/26 revision electrical permit covers Boulder, CO permit… in Boulder, filed July 24, 2026, with an estimated value of $39,750.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 11 records on Quince Avenue from Aug 12, 2025 through Aug 12, 2026, including 11 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 229% vs prior 30 days711 permits vs 216 · through Aug 7, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JUL 24, 2026

    Boulder, CO permit 6db141d5-9c00-4fcf-8da0-2d2605fa5fcc: Wireless Facility Permit

    permit · Electrical · Issued; Description: ***7/2/26 Revision to electrical design*** Small Cell Facility: Due to system limitations, wireless · $32,500
  2. JULY 24, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Issued; Description: ***7/2/26 Revision to electrical design · $39,750
  3. JUL 21, 2026

    Boulder, CO permit 1f68a812-dd67-4a8a-96fb-ce750e21f96d: Right-of-Way Permit

    permit · Unclassified · Issued; Description: ADR2025-00129 | Proposed Standalone small cell to be installed southeast of Quince ave and 15th st · $1,200