LIVE PERMIT
Boulder, CO permit…
This issued; description: install 60a 240v ci ev charger permit covers Boulder, CO permit… in Boulder, filed July 14, 2026, with an estimated value of $1,027.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 7 records on 10Th Street from Aug 12, 2025 through Aug 12, 2026, including 7 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
Boulder, CO County permits up 229% vs prior 30 days711 permits vs 216 · through Aug 7, 2026
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.
- Electrician (panel upgrade)
- Solar
RECORD ACTIVITY
Activity timeline
-
JULY 14, 2026
Boulder, CO permit… This permit
Permit · EV charger · Issued; Description: Install 60a 240v circuit for EV wall ch · $1,027