PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This letter of completion; description: meter electrical permit covers Boulder, CO permit… in Boulder, filed July 6, 2026, with an estimated value of $4,000.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 9 records on 17Th Street from Aug 12, 2025 through Aug 12, 2026, including 9 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 229% vs prior 30 days711 permits vs 216 · through Aug 7, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JUL 10, 2026

    Boulder, CO permit 35087e4a-dd3c-4624-a0e5-655c6948a079: Mechanical Permit

    permit · HVAC · Issued; Description: Installation of a Two head Mini-split heat pump system Installation of a new electrical 240v electr · $11,338
  2. JULY 6, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Letter of Completion; Description: Meter panel upgrade to 20 · $4,000