PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Maricopa, AZ permit WS260101: Water Sewer

Guadalupe · Maricopa, AZ County

New construction permit

This issued; description: new residential 3/4 new construction permit covers Maricopa, AZ permit WS260101: Water Sewer in Guadalupe, filed July 23, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

This is the only record collected on S Calle Sahuaro in the latest 12-month window.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Maricopa, AZ County permits up 121% vs prior 30 days902 permits vs 409 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.

  • HVAC
  • Gutters
  • Driveway/concrete
  • Landscaping
  • Security/low-voltage
  • Solar
  • Fence
  • Window treatment
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. JULY 23, 2026

    Maricopa, AZ permit WS260101: Water Sewer This permit

    Permit · New construction · Issued; Description: New Residential 3/4 inch Water meter