PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This issued; description: at&t doing modifica electrical permit covers Boulder, CO permit… in Boulder, filed April 27, 2026, with an estimated value of $25,000.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 30 records on Quince Avenue from Aug 12, 2025 through Aug 12, 2026, including 30 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. APRIL 27, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Issued; Description: AT&T doing modifications to existing ce · $25,000
  2. APR 24, 2026

    Boulder, CO permit e6ba58e8-1da3-4cba-8132-59e6c4b3c73a: Wireless Facility Permit

    permit · Electrical · Issued; Description: AT&T doing modifications to existing cell site equipment located on rooftop of building · $25,000