PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This closed; description: 150 amp temporary p electrical permit covers Boulder, CO permit… in Boulder, filed April 2, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 12 records on Orchard Avenue from Aug 12, 2025 through Aug 12, 2026, including 12 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. MAY 27, 2026

    Boulder, CO permit f8f3711a-e5cc-4334-8826-68b92a681857: Demolition Permit

    permit · Demolition · Issued; Description: Full demolition of an existing 1,600 SF single story ranch
  2. APRIL 2, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Closed; Description: 150 amp temporary power pedestal adjace
  3. MAR 10, 2026

    Boulder, CO permit c993f250-8f34-4be9-86a8-b3d98d65e383: Right-of-Way Permit

    permit · Demolition · Warranty; Description: Gas demo (1) 5x5 street cut (3) potholes **contractor must notify impacted residents 72 hrs in ad · $1,000