PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This closed; description: the temporary const electrical permit covers Boulder, CO permit… in Boulder, filed February 25, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 12 records on Orchard Avenue from Aug 12, 2025 through Aug 12, 2026, including 12 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JUL 16, 2026

    Boulder, CO permit b3a54743-2b08-48be-a206-7e06fa0266d8: Building Permit - Accessory

    permit · Solar · Issued; Description: The project consists of the following: A 24'x 44' Garage/ Shop space of 1,056 sf with an 780 sf ADU · $210,180
  2. APR 24, 2026

    Boulder, CO permit 77dfb9a8-8fa4-45e9-98a9-8b45b6d37795: Demolition Permit

    permit · Demolition · Closed; Description: Deconstruction of the single room, 816 sf, detached garage only
  3. MAR 24, 2026

    Boulder, CO permit 8aebb0f0-107c-4912-9513-fd4627cffcfa: Right-of-Way Permit

    permit · Demolition · Warranty; Description: Residential gas service Demo - Remove 78' of 3/4" Steel SVC · $1,000
  4. FEBRUARY 25, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Closed; Description: The temporary construction power pole i