PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This closed; description: electric temporary electrical permit covers Boulder, CO permit… in Boulder, filed April 2, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 24 records on Linden Avenue from Aug 12, 2025 through Aug 12, 2026, including 24 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days685 permits vs 621 · through Aug 10, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. APRIL 2, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Closed; Description: Electric Temporary Construction Power
  2. FEB 27, 2026

    Boulder, CO permit 7ff9d182-a67f-4115-941d-34846e2653ad: Demolition Permit

    permit · Demolition · Issued; Description: Deconstruct cinderblock outbuilding at the time the main house is demolished
  3. FEB 27, 2026

    Boulder, CO permit 13e02dc6-9e17-4320-b12b-4aebd0781e92: Demolition Permit

    permit · Demolition · Issued; Description: Demolish house with attached garage