Boulder, CO permit…
This issued; description: demolish house with demolition permit covers Boulder, CO permit… in Boulder, filed February 27, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 24 records on Linden Avenue from Aug 12, 2025 through Aug 12, 2026, including 24 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Demolition work with New-construction GC, Hauling/dumpster as common follow-on categories.
- New-construction GC
- Hauling/dumpster
RECORD ACTIVITY
Activity timeline
-
APR 2, 2026
Boulder, CO permit d9f4f2bb-e461-4f4f-b04c-5a5937964c08: Electrical Permit
permit · Electrical · Closed; Description: Electric Temporary Construction Power -
FEB 27, 2026
Boulder, CO permit 7ff9d182-a67f-4115-941d-34846e2653ad: Demolition Permit
permit · Demolition · Issued; Description: Deconstruct cinderblock outbuilding at the time the main house is demolished -
FEBRUARY 27, 2026
Boulder, CO permit… This permit
Permit · Demolition · Issued; Description: Demolish house with attached garage