PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

Electrical permit

This issued; description: install temp constr electrical permit covers Boulder, CO permit… in Boulder, filed August 14, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 8 records on Jefferson Street from Aug 15, 2025 through Aug 15, 2026, including 8 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 15, 2025 through Aug 15, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 22% vs prior 30 days743 permits vs 608 · through Aug 14, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. AUGUST 14, 2026

    Boulder, CO permit… This permit

    Permit · Electrical · Issued; Description: Install temp construction meter in back