H - Residential Electrical Permit
This ready to issue; description: electrical hvac permit covers H - Residential Electrical Permit in Gainesville, filed August 20, 2026; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 4 records on Harbour Landing Drive from Sep 2, 2025 through Sep 2, 2026, including 4 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Sep 2, 2025 through Sep 2, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect HVAC work with Insulation, Duct cleaning, Smart thermostat, Air quality, Solar as common follow-on categories.
- Insulation
- Duct cleaning
- Smart thermostat
- Air quality
- Solar
RECORD ACTIVITY
Activity timeline
-
AUG 20, 2026
Hall permit HRMEC26-0222: H - Residential Mechanical Permit
permit · HVAC · Ready to Issue; Description: MECHANICAL FOR ENCLOSE PART OF UNFINISHED BASEMENT BY ADDING WALL AND CREATING AN EXCERCISE -
AUGUST 20, 2026
H - Residential Electrical Permit This permit
Permit · HVAC · Ready to Issue; Description: ELECTRICAL FOR ENCLOSE PART OF -
AUG 11, 2026
Hall permit HRADD26-0313: H - Residential Additions-Alterations Permit
permit · HVAC · In Review; Description: ENCLOSE PART OF UNFINISHED BASEMENT BY ADDING WALL AND CREATING AN EXCERCISE ROOM - FOOTPRINT TO