PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

H - Residential New Construction Permit

Braselton · Hall County

New construction permit

This pending; description: new construction o new construction permit covers H - Residential New Construction Permit in Braselton, filed August 23, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 2 records on Still Water Lane from Sep 2, 2025 through Sep 2, 2026, including 2 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Sep 2, 2025 through Sep 2, 2026. The count includes this filing and only records in our database.

Hall County permits up 42% vs prior 30 days698 permits vs 491 · through Sep 2, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.

  • HVAC
  • Gutters
  • Driveway/concrete
  • Landscaping
  • Security/low-voltage
  • Solar
  • Fence
  • Window treatment
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. AUG 27, 2026

    Hall permit HRNEW26-1235: H - Residential New Construction Permit

    permit · New construction · Pending; Description: New construction of a 1792 SqFt two-story single-family home on slab
  2. AUGUST 23, 2026

    H - Residential New Construction Permit This permit

    Permit · New construction · Pending; Description: New construction of a 1792 SqFt single