PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit…

Boulder · Boulder, CO County

New construction permit

This issued; description: full structure deco new construction permit covers Boulder, CO permit… in Boulder, filed August 31, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 8 records on Kenwood Drive from Sep 2, 2025 through Sep 2, 2026, including 8 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Sep 2, 2025 through Sep 2, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 10% vs prior 30 days684 permits vs 621 · through Sep 1, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect New construction work with HVAC, Gutters, Driveway/concrete, Landscaping, Security/low-voltage, Solar, Fence, Window treatment, Cleaning as common follow-on categories.

  • HVAC
  • Gutters
  • Driveway/concrete
  • Landscaping
  • Security/low-voltage
  • Solar
  • Fence
  • Window treatment
  • Cleaning

RECORD ACTIVITY

Activity timeline

  1. AUGUST 31, 2026

    Boulder, CO permit… This permit

    Permit · New construction · Issued; Description: Full structure deconstruction of a sing
  2. JUL 10, 2026

    Boulder, CO permit d5d2708b-0108-4b23-b6a8-f48e45c598c2: Electrical Permit

    permit · Electrical · Issued; Description: Temporary electrical power
  3. JUN 22, 2026

    Boulder, CO permit 888aedea-5108-4423-b407-12ddc2e88b8f: Right-of-Way Permit

    permit · Demolition · Warranty; Description: WO115909640 | Gas demo (1) 5x5 dig pit (2) potholes **contractor must notify impacted residents 7 · $1,000