Virginia Beach city, VA permit 2025-MECC-28608:…
This final; description: install new ice mach hvac permit covers Virginia Beach city, VA permit 2025-MECC-28608:… in Virginia Beach city, VA County, filed November 21, 2025; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 116 records on Laskin Road from Sep 11, 2025 through Sep 11, 2026, including 116 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Sep 11, 2025 through Sep 11, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect HVAC work with Insulation, Duct cleaning, Smart thermostat, Air quality, Solar as common follow-on categories.
- Insulation
- Duct cleaning
- Smart thermostat
- Air quality
- Solar
RECORD ACTIVITY
Activity timeline
-
JUL 14, 2026
Virginia Beach city, VA permit 2026-ELEC-18649: Electrical
permit · Electrical · Active; Description: Install receptacle location for drinking fountain -
JUN 1, 2026
Virginia Beach city, VA permit 2026-PLBC-11045: Plumbing
permit · Plumbing · Active; Description: Install a drinking fountain in business location -
JAN 20, 2026
Virginia Beach city, VA permit 2026-PLBC-01298: Plumbing
permit · Plumbing · Final; Description: Applying for Certificate of Occupancy for Sleepy Cowgirl Coffee *** GREASE TRAP APPROVED BY SOADY 50 -
JAN 20, 2026
Virginia Beach city, VA permit 2026-BDCA-01229: Building
permit · Commercial · Final; Description: NEW TENANT BUILD-OUT -- SLEEPY COWGIRL COFFEE - USE GROUP B (A-2 < 50) / CONSTRUCTION TYPE 2B / NON -
NOVEMBER 21, 2025
Virginia Beach city, VA permit 2025-MECC-28608:… This permit
Permit · HVAC · Final; Description: Install new ice machine with precharged -
NOV 19, 2025
Virginia Beach city, VA permit 2025-ELEC-28611: Electrical
permit · Electrical · Final; Description: Install breaker on existing electrical panel and run new 240V, 1PH, 30A circuit for new ice machine