Virginia Beach city, VA permit 2025-ELER-27096:…
This final; description: add one 60-amp break ev charger permit covers Virginia Beach city, VA permit 2025-ELER-27096:… in Virginia Beach city, VA County, filed October 31, 2025; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
This is the only record collected on Dunning Arch in the latest 12-month window.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Sep 11, 2025 through Sep 11, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect EV charger work with Electrician (panel upgrade), Solar as common follow-on categories.
- Electrician (panel upgrade)
- Solar
RECORD ACTIVITY
Activity timeline
-
OCTOBER 31, 2025
Virginia Beach city, VA permit 2025-ELER-27096:… This permit
Permit · EV charger · Final; Description: Add one 60-amp breaker for electric car