Virginia Beach city, VA permit 2025-ELER-25567:…
This final; description: install 2 31-60 amp electrical permit covers Virginia Beach city, VA permit 2025-ELER-25567:… in Virginia Beach city, VA County, filed October 16, 2025; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 11 records on Holly Point Road from Sep 11, 2025 through Sep 11, 2026, including 11 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Sep 11, 2025 through Sep 11, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
OCTOBER 16, 2025
Virginia Beach city, VA permit 2025-ELER-25567:… This permit
Permit · Electrical · Final; Description: Install 2 31-60 AMP Circuits -
OCT 15, 2025
Virginia Beach city, VA permit 2025-MECR-25565: Mechanical
permit · HVAC · Final; Description: Replace gas furnace, AC, air handler, and heat pumpREMOVED 1- A/C AND ADDED 1- AIR