Virginia Beach city, VA permit 2025-ELER-25206:…
This final; description: digging trench to ru electrical permit covers Virginia Beach city, VA permit 2025-ELER-25206:… in Virginia Beach city, VA County, filed October 13, 2025; the source does not list an estimated value.
Atmospheric image—not a photo of this permit.
LOCAL SIGNAL
This street
The collected record set contains 10 records on Mcgregor Drive from Sep 11, 2025 through Sep 11, 2026, including 10 permits.
Why?
We normalize the street name from the collected address, then count records in the same county with that normalized street name from Sep 11, 2025 through Sep 11, 2026. The count includes this filing and only records in our database.
PERMIT SEQUENCE
What typically follows
The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.
- Generator
- EV charger
- Solar
- Smart home/low-voltage
RECORD ACTIVITY
Activity timeline
-
OCTOBER 13, 2025
Virginia Beach city, VA permit 2025-ELER-25206:… This permit
Permit · Electrical · Final; Description: Digging trench to run new wiring to exis -
SEP 18, 2025
Virginia Beach city, VA permit 2025-MECR-23027: Mechanical
permit · HVAC · Final; Description: Replacing gas furnace (in the garage) and installing A2L AC and coil (outside) -
SEP 18, 2025
Virginia Beach city, VA permit 2025-ELER-23025: Electrical
permit · HVAC · Final; Description: Installing a dedicated 40–60 amp electrical circuit to supply power for HVAC equipment