PERMITREPORTER GEORGIA

THE WIREFORSYTH → RECORD Nº 007010

ROADS · DEC 19 2024 · FORSYTH COUNTY

Road project 0002862: SR 20 FROM SR 369/CHEROKEE TO POST ROAD/FORSYTH

Under Construction · Widening · Cities: Not City · Funding: GEPA · “PI 0002862 is the widening and reconstruction of SR 20 from east of SR 369 in Cherokee County to west of SR 371 in Forsyth County to six lanes (three lanes in each direction) with a 20-foot raised median and urban shoulders. Access to side roads and driveways will be controlled by Restricted Crossing U-turns (RCUTs) placed in the median; RCUT locations are shown in the layouts but may change based on preliminary design. Truck turnarounds are provided at certain RCUT locations based on the consideration of adjacent facilities that may draw tractor-trailers. The total project length is about 6.3 miles. There are no bridges or other major structures. This project begins where PI 0014133 ends with the SR 369 intersection being constructed with PI 0014133 and ends where PI 0003682 begins with the SR 371 intersection being constructed with PI 0003682.”

NEARBY ON THE RECORD · Forsyth County

  1. ROADS MAY 28 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project M007056: SR 369 FROM HOLTZCLAW ROAD/FORSYTH TO MCEVER ROAD/HALL

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Gainesville, Not City · SR 369 FROM HOLTZCLAW ROAD/FORSYTH TO MCEVER ROAD/HALL

  2. ROADS MAY 26 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project 0021750: SR 141 @ SHARON ROAD

    Construction Work Program · Turn Lanes · Routes: 0000 · Cities: Not City · SR 141 @ SHARON ROAD

  3. ROADS MAY 01 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project S016245: SR 369 @ MAGNOLIA CREEK DR INSTALL RIGHT-HAND PASSING LANE

    Construction Work Program · Passing Lanes · Routes: 0000 · Cities: Not City · SR 369 @ MAGNOLIA CREEK DR INSTALL RIGHT-HAND PASSING LANE

  4. ROADS MAR 24 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project T005621: FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

    Construction Work Program · Transit Projects · FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

  5. ROADS JAN 07 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project 0020610: SHADY GROVE ROAD & SHADBURN FERRY ROAD MULTI-USE TRAIL

    Construction Work Program · Shared Use Path · Cities: Not City · SHADY GROVE ROAD & SHADBURN FERRY ROAD MULTI-USE TRAIL

  6. ROADS NOV 19 2025 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project M006500: BRIDGE PRESERVATION @ 4 SR LOCS IN DISTRICT 1

    Under Construction · Bridges · Cities: Braselton, Not City · Funding: NEPA · BRIDGE PRESERVATION @ 5 SR LOCS IN DISTRICT 1 The work involves Bridge Preservation – Polymer Overlay and Painting of the steel beams/steel pil…