THE WIREFORSYTH → RECORD Nº 007026

ROADS · DEC 03 2024 · FORSYTH COUNTY

Road project 0006915: POST ROAD FROM SR 9 TO CR 5/KELLY MILL ROAD

Construction Work Program · Widening · Cities: Not City · Funding: GEPA · The proposed project consists of widening Post Rd from SR 9 (Atlanta Hwy) to Kelly Mill Rd. It is located west of the City of Cumming in west Forsyth County. The project length is 3.64 miles. The proposed design includes two lanes in each direction with a 16-ft raised median. The design speed is 45 mph. The proposed urban shoulder widths are 10 ft on the west side with 2 ft-6-inch curb and gutter & 5-ft sidewalk & 16 ft on the east side with 2 ft-6-inch curb and gutter & 10-ft sidewalk. Operational access at all intersections will also be investigated to determine access & intersection control types. This project is a local let & is expected to take 36 months to complete. The approved Concept Report includes two projects: PI 0006915 and PI 0013965 (Widen Post Rd from Kelly Mill Rd to SR 20). The sponsor has decided to pursue the PI 0006915 portion at this time.

NEARBY ON THE RECORD · Forsyth County

  1. ROADS MAY 28 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project M007056: SR 369 FROM HOLTZCLAW ROAD/FORSYTH TO MCEVER ROAD/HALL

    Construction Work Program · Resurface & Maintenance · Routes: 0000 · Cities: Gainesville, Not City · SR 369 FROM HOLTZCLAW ROAD/FORSYTH TO MCEVER ROAD/HALL

  2. ROADS MAY 26 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project 0021750: SR 141 @ SHARON ROAD

    Construction Work Program · Turn Lanes · Routes: 0000 · Cities: Not City · SR 141 @ SHARON ROAD

  3. ROADS MAY 01 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project S016245: SR 369 @ MAGNOLIA CREEK DR INSTALL RIGHT-HAND PASSING LANE

    Construction Work Program · Passing Lanes · Routes: 0000 · Cities: Not City · SR 369 @ MAGNOLIA CREEK DR INSTALL RIGHT-HAND PASSING LANE

  4. ROADS MAR 24 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project T005621: FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

    Construction Work Program · Transit Projects · FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

  5. ROADS JAN 07 2026 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project 0020610: SHADY GROVE ROAD & SHADBURN FERRY ROAD MULTI-USE TRAIL

    Construction Work Program · Shared Use Path · Cities: Not City · SHADY GROVE ROAD & SHADBURN FERRY ROAD MULTI-USE TRAIL

  6. ROADS NOV 19 2025 · FORSYTH · GEORGIA DOT PROJECT HUB

    Road project M006500: BRIDGE PRESERVATION @ 4 SR LOCS IN DISTRICT 1

    Under Construction · Bridges · Cities: Braselton, Not City · Funding: NEPA · BRIDGE PRESERVATION @ 5 SR LOCS IN DISTRICT 1 The work involves Bridge Preservation – Polymer Overlay and Painting of the steel beams/steel pil…