PERMITREPORTER GEORGIA

THE WIREDAWSON → RECORD Nº 007132

ROADS · NOV 06 2018 · DAWSON COUNTY

Road project 0013990: SR 136 @ TOTO CREEK 7.6 MI SE OF DAWSONVILLE

Under Construction · Bridges · Cities: Not City · Funding: NEPA · The project consists of the replacement of the SR 136 bridge over Toto Creek (Lake Lanier) near Dawsonville, GA. The existing bridge will be closed during construction and the proposed bridge will be reconstructed in the current location. The new bridge will include two 12-foot lanes and an 8-foot shoulder on each side. The roadway approaches will be reconstructed to tie into the existing road on both sides of the proposed bridge. The proposed roadway will include two 12-foot lanes and a 10-foot overall shoulder with 4-foot paved on each side. A local detour (Henry Grady Hwy) will be provided with all nearby roads remaining open during construction. The total project length is 0.1 miles.

NEARBY ON THE RECORD · Dawson County

  1. ROADS APR 14 2026 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project T008085: FY 2027-DAWSON COUNTY-SEC.5311-OPERATIONS

    Construction Work Program · Rural Transit - Capital/Ops · This project will fund transit capital and transit operations in FY 2027 for Dawson County.

  2. ROADS MAR 24 2026 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project T005621: FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

    Construction Work Program · Transit Projects · FY 2018 FTA SECTION 5307/5340 FORMULA FUNDS FOR RTC

  3. ROADS SEP 15 2025 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project 0021155: SR 400 FROM LEE CASTLEBERRY ROAD TO LUMPKIN CAMPGROUND ROAD

    Construction Work Program · Signals · Cities: Not City · SR 400 FM LEE CASTLE BERRY RD/BLUE RIDGE PKWY TO LUMPKIN CAMPGROUND RD/HARMONY CHURCH RD: This project consists of signalizing 4 existing RCUTs, upgrading 4 existi…

  4. ROADS SEP 02 2025 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project M006852: SR 53 @ SHOAL CREEK - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Not City · Funding: NEPA · Bridge Preventative Maintenance. The work will consist of deck rehabilitation (LMC), joint replacement, painting the steel beam ends and bearings, …

  5. ROADS MAY 15 2025 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project T009351: FY 2029-DAWSON COUNTY-SEC.5311-OPERATIONS

    Construction Work Program · Rural Transit - Capital/Ops · FY 2029-DAWSON COUNTY-SEC.5311-OPERATIONS

  6. ROADS MAY 15 2025 · DAWSON · GEORGIA DOT PROJECT HUB

    Road project T009353: FY 2030-DAWSON COUNTY-SEC.5311-OPERATIONS

    Construction Work Program · Rural Transit - Capital/Ops · FY 2030-DAWSON COUNTY-SEC.5311-OPERATIONS