PermitReporterKnow what’s breaking ground.
Get Lead Alerts
Get Lead Alerts
LIVE PERMIT

Boulder, CO permit d6611e1f-2827-4c68-8ebe-…

Boulder · Boulder, CO County

Electrical permit

This issued; description: construction of a m electrical permit covers Boulder, CO permit d6611e1f-2827-4c68-8ebe-… in Boulder, filed July 1, 2026; the source does not list an estimated value.

Atmospheric image—not a photo of this permit.

LOCAL SIGNAL

This street

The collected record set contains 3 records on University Avenue from Aug 12, 2025 through Aug 12, 2026, including 3 permits.

Why?

We normalize the street name from the collected address, then count records in the same county with that normalized street name from Aug 12, 2025 through Aug 12, 2026. The count includes this filing and only records in our database.

Boulder, CO County permits up 229% vs prior 30 days711 permits vs 216 · through Aug 7, 2026

PERMIT SEQUENCE

What typically follows

The deterministic permit-sequence rules connect Electrical work with Generator, EV charger, Solar, Smart home/low-voltage as common follow-on categories.

  • Generator
  • EV charger
  • Solar
  • Smart home/low-voltage

RECORD ACTIVITY

Activity timeline

  1. JUL 14, 2026

    Boulder, CO permit 4a43966a-e520-499d-9e08-c22a7a77b57e: Demolition Permit

    permit · Demolition · Issued; Description: Complete structure deconstruction
  2. JULY 1, 2026

    Boulder, CO permit d6611e1f-2827-4c68-8ebe-… This permit

    Permit · Electrical · Issued; Description: Construction of a multi unit building *