PERMITREPORTER GEORGIA

SHEET Nº 1 → COUNTY SHEET

FULTON COUNTY

County seat: Atlanta. 373,083 parcels on the county roll. 3,927 recorded subdivisions indexed for search.

Parcel count and dedicated subdivision-layer availability verified 2026-07-13.

building permits (units) 1,007 units 2026-05 · U.S. CENSUS BUREAU BUILDING PERMITS SURVEY · PER MONTH
permit valuation $141,302,361 2026-05 · U.S. CENSUS BUREAU BUILDING PERMITS SURVEY · PER MONTH
house-price change (yr) +1.24% 2025 · FEDERAL HOUSING FINANCE AGENCY HPI
mortgages originated 21,536 originations 2024 · CFPB/FFIEC HMDA · PER YEAR

WHAT FULTON MAKES PUBLIC

Foreclosure notice source terms prohibit automated collection Tax sale & excess funds county tax portal returns HTTP 403 to automation Recorded sale public yearly-sales GIS stops at 2022 and has no sale date Permit LIVE Rezoning case LIVE County meeting LIVE Land clearing LIVE Road project LIVE New business LIVE Storm event LIVE Flood map change FEMA robots.txt disallows /arcgis Court opinion LIVE New plat reference subdivisions only; no plat activity collector Code enforcement LIVE Public notice LIVE

THE WIRE · Fulton County

  1. ROADS AUG 22 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0018033: ATLANTA TRAFFIC SIGNAL ENHANCEMENTS - PHASE II

    Construction Work Program · Signals · Cities: Atlanta · Funding: NEPA · The project proposes signal equipment upgrades, detection upgrades, pavement marking improvements, ADA ramps, 4G or Fiber traffic communications ins…

  2. ROADS AUG 14 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project S016199: SR 8 BETWEEN PRINCE PL & HALL ST PHB INSTALLATION

    Construction Work Program · Pedestrian Facilities · Cities: Atlanta · SR 8 BETWEEN PRINCE PL & HALL ST PHB INSTALLATION

  3. ROADS AUG 11 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006779: SR 138 FROM SR 14 TO BUFFINGTON ROAD

    Construction Work Program · Resurface & Maintenance · Cities: Fairburn, Union City · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 138 to improve the roadways current…

  4. ROADS AUG 06 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006828: SR 70 FROM CEDAR BRANCH TO SR 154

    Construction Work Program · Resurface & Maintenance · Cities: Chattahoochee Hills, South Fulton · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 70 to improve the road…

  5. ROADS AUG 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0004634: MCGINNIS FERRY ROAD FROM DOUGLAS ROAD TO HOSPITAL PKWY-PH I

    Under Construction · Widening · Cities: Johns Creek, Not City · Funding: GEPA · The proposed project would consist of the widening of McGinnis Ferry Road from Seven Oaks Parkway terminating approximately 1000 feet east o…

  6. ROADS JUL 30 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006558: SR 14 FROM SR 14 ALT TO NORMAN BERRY DRIVE

    Under Construction · Resurface & Maintenance · Cities: College Park, East Point, South Fulton · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 14 to improve the roadwa…

  7. ROADS JUL 18 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006805: I-85 FROM MERIWETHER COUNTY LINE TO SR 74

    Construction Work Program · Concrete Preservation · Cities: Fairburn, Grantville, Newnan, Not City, Palmetto · I-85 FROM MERIWETHER COUNTY LINE TO SR 74

  8. ROADS JUL 08 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project S016154: Install RCUT & U-Turn on SR 70 @ Rivertown Rd

    Under Construction · RCUT · Cities: Chattahoochee Hills, South Fulton · Install RCUT & U-Turn on SR 70 @ Rivertown Rd

  9. ROADS JUN 20 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0017135: I-285 WB FM HENDERSON TO NORTHSIDE DR;INC SR 400-EXPRESS LN

    Construction Work Program · Managed Lanes · Cities: Doraville, Dunwoody, Not City, Sandy Springs, Tucker · Funding: NEPA · This project will construct two Express Lanes in each direction on I-285 from the North Springs M…

  10. ROADS JUN 18 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021192: BUFORD SPRING CONNECTOR @ I-85 - TUNNEL LIGHTING

    Under Construction · Lighting · Cities: Atlanta · Funding: NEPA · The purpose of this project is to upgrade the existing tunnel lighting from HPS to energy-efficient LED fixtures. Scope of work may also include replaceme…

  11. ROADS JUN 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021298: PEACHTREE STREET FROM NORTH AVE TO W PEACHTREE STREET

    Construction Work Program · Roadway Project · Cities: Atlanta · Funding: NEPA · Located in the City of Atlanta, the project is along Peachtree Street beginning at North Avenue and ending at West Peachtree Street. The pro…

  12. ROADS JUN 03 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021310: I-20 FROM CAPITOL AVE TO FLAT SHOALS ROAD - LIGHTING

    Under Construction · Lighting · Cities: Atlanta, Not City · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope o…

  13. ROADS JUN 03 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021309: I-20 FROM LINKWOOD ROAD TO I-85 - LIGHTING

    Under Construction · Lighting · Cities: Atlanta · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope of work may…

  14. ROADS JUN 03 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021308: I-85 FROM I-75 TO N OF LENOX ROAD - LIGHTING

    Under Construction · Lighting · Cities: Atlanta · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope of work may…

  15. ROADS JUN 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006784: SR 166 FROM W OF SYLVAN ROAD TO LAKEWOOD AVE

    Construction Work Program · Resurface & Maintenance · Cities: Atlanta · Funding: NEPA · SR 166 FROM W OF SYLVAN ROAD TO LAKEWOOD AVE

  16. ROADS JUN 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006783: SR 6 FROM BUTNER ROAD TO I-85

    Construction Work Program · Resurface & Maintenance · Cities: Atlanta, College Park, East Point, South Fulton · Funding: NEPA · SR 6 FROM BUTNER ROAD TO I-85

  17. ROADS JUN 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021299: MARIETTA BLVD FROM SR 8 TO CORONET WAY

    Construction Work Program · Roadway Project · Cities: Atlanta · Funding: NEPA · Located in City of Atlanta, the project is along Marietta Boulevard beginning at State Route 8/Donald Lee Hollowell Parkway and ending at Co…

  18. ROADS MAY 22 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project S016171: SR 372 & Green Rd -Install Temporary Signal & Ped. Facil

    Under Construction · Pedestrian Facilities · Cities: Alpharetta · SR 372 & Green Rd -Install Temporary Signal & Ped. Facil

  19. ROADS MAY 19 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project T009359: FY 2030 FTA SECTION 5329 STATE SAFETY OVERSIGHT

    Construction Work Program · Rail Projects · FY 2030 FTA SECTION 5329 STATE SAFETY OVERSIGHT

  20. ROADS MAY 19 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project T009358: FY 2029 FTA SECTION 5329 STATE SAFETY OVERSIGHT

    Construction Work Program · Rail Projects · FY 2029 FTA SECTION 5329 STATE SAFETY OVERSIGHT

  21. ROADS MAY 15 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006775: SR 70/SR 154 FROM SOUTH FULTON PKWY TO SR 92

    Construction Work Program · Resurface & Maintenance · Cities: Chattahoochee Hills, South Fulton · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 70/SR 154 to improve t…

  22. ROADS MAY 15 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006773: SR 9 FROM SR 141 TO ABERNATHY ROAD

    Construction Work Program · Resurface & Maintenance · Cities: Atlanta, Sandy Springs · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 9 to improve the roadways current…

  23. ROADS MAY 15 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006772: SR 8/US 278 FROM COBB COUNTY LINE TO SR 280

    Under Construction · Resurface & Maintenance · Cities: Atlanta · Funding: NEPA · This project, selected by the District Maintenance Office, is the resurfacing of SR 8/US 278 to improve the roadways current low OCI score.

  24. ROADS MAY 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006771: I-75/I-85 @ PRYOR STREET - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Atlanta · Funding: NEPA · Bridge Rehabilitation for 121-0056-0. The work will consist of bridge deck header reconstruction, replacement of bearings, polymer overlay of the br…

  25. ROADS MAY 05 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021273: SR 9 FROM WINDWARD PKWY TO FORSYTH COUNTY LINE

    Construction Work Program · Widening · Cities: Alpharetta, Milton · Funding: GEPA · SR 9 FM WINDWARD PARKWAY TO FORSYTH COUNTY LINE

  26. ROADS MAY 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006768: I-85 & I-285 @ 3 LOCS IN FULTON COUNTY - BRIDGE PREVENTATIVE

    Construction Work Program · Bridges · Cities: Atlanta · Funding: NEPA · Bridge Rehabilitation. The work will consist of deck rehabilitation, replacement of edge beams, joint replacement, painting the steel beams, spall r…

  27. ROADS APR 24 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project T009183: FY 2030-ATLANTA MPO-SEC.5303-PLANNING

    Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2030 for the Atlanta MPO (ARC). ***[ARC operates on a calendar year]

  28. ROADS APR 24 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project T009181: FY 2029-ATLANTA MPO-SEC.5303-PLANNING

    Construction Work Program · MPO/Region Transit · This project will fund transit planning in FY 2029 for the Atlanta MPO (ARC). ***[ARC operates on a calendar year]

  29. ROADS APR 21 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0020767: I-75 FROM MUSKET RIDGE DRIVE TO I-85 - LIGHTING

    Under Construction · Lighting · Cities: Atlanta · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope of work may…

  30. ROADS APR 21 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0020766: I-75 FROM FRONTAGE ROAD TO I-85 - LIGHTING

    Under Construction · Lighting · Cities: Atlanta, Not City · Funding: NEPA · The purpose of this project is to upgrade the existing lighting systems, along this corridor, from HPS to energy-efficient LED fixtures. Scope o…

  31. ROADS APR 03 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 721000-: SR 120 FROM JONES CREEK COMMONS TO S OF BOLES ROAD

    Construction Work Program · Widening · Cities: Johns Creek · Funding: NEPA · The proposed project would widen SR 120/Abbotts Bridge Rd from SR 141/Medlock Bridge Rd to Peachtree Industrial Blvd from two to four through l…

  32. ROADS MAR 25 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021239: SR 120 FROM BOLES ROAD TO RIVER MILL DRIVE

    Construction Work Program · Widening · Cities: Duluth, Johns Creek, Not City · Funding: NEPA · This project was originally programmed to widen State Route (SR) 120/Abbotts Bridge Road from SR 141/Medlock Bridge Road to P…

  33. ROADS MAR 24 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021232: MCGINNIS FERRY ROAD FM UNION HILL ROAD TO DOUGLAS ROAD-PH II

    Construction Work Program · Widening · Cities: Alpharetta, Not City · MCGINNIS FERRY ROAD FM UNION HILL ROAD TO DOUGLAS ROAD-PH II

  34. ROADS MAR 18 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021223: PATH 400 TRAIL EXT FM WINDSOR PKWY TO N OF BAROQUE CIR-PH II

    Under Construction · Bicycle/Ped. Facility · Cities: Sandy Springs · Funding: NEPA · This project is the middle section (Segment 2) of the PATH400 Trail Extension project that was previously designed, reviewed and approv…

  35. ROADS MAR 18 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021211: JONES BRIDGE PARK CONNECTOR @ CHATTAHOOCHEE RIVER-PED BRIDGE

    Construction Work Program · Shared Use Path · Cities: Johns Creek, Not City, Peachtree Corners · The project intends to build a 12-ft-wide pedestrian bridge. The proposed bridge connects the west side of Jones Bridge Par…

  36. ROADS MAR 13 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021209: ROBERTS DRIVE FM DUNWOODY PLACE TO SUMMER CROSSING - PHASE I

    Construction Work Program · Preliminary Engineering · Cities: Sandy Springs · Located in the City of Sandy Springs along Roberts Drive, beginning at Dunwoody Place and ending at Island Ford Parkway (programmed to end at …

  37. ROADS MAR 13 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021208: SR 372 @ NEW BULLPEN ROAD

    Construction Work Program · Intersection Improvement · Cities: Milton · Funding: NEPA · Located in the City of Milton, the project is at the intersection of SR372/Birmingham Highway and New Bullpen Road. The project inte…

  38. ROADS MAR 13 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021207: SR 372 @ BATESVILLE ROAD

    Construction Work Program · Intersection Improvement · Cities: Milton · Funding: NEPA · Located in the City of Milton, the project is at the intersection of SR 372/Birmingham Highway and Batesville Road. The project inte…

  39. ROADS MAR 11 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021195: LAKEWOOD TRAIL FROM ATLANTA BELTLINE TO PRYOR ROAD - PHASE I

    Construction Work Program · Shared Use Path · Cities: Atlanta · Funding: NEPA · Located in City of Atlanta, the project begins at Southside Beltline Trail and ends at Pryor Road at Meldon Avenue. The project intends to b…

  40. ROADS MAR 10 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006748: I-20 @ 2 LOCS IN FULTON COUNTY - BRIDGE PREVENTATIVE

    Under Construction · Bridges · Cities: Atlanta · Funding: NEPA · Bridge Rehabilitation. The work will consist of spall repair of the headers, joint replacement, painting the steel beams, spall repair of the superstructur…

  41. ROADS MAR 06 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021181: SR 6 @ COMMERCE DRIVE

    Construction Work Program · Operational Improvement · Cities: East Point · The proposed improvement would provide an additional 250 ft of storage for the eastbound shared thru-right turn lane. By widening into the median…

  42. ROADS FEB 21 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M006720: SR 237 @ PEACHTREE CREEK - BRIDGE REHAB

    Construction Work Program · Bridges · Cities: Atlanta · SR 237 @ PEACHTREE CREEK - BRIDGE REHAB

  43. ROADS JAN 28 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021093: I-285 FROM COLUMBIA DR TO BOULDER PARK DR - AID UPGRADES

    Construction Work Program · ITS · Cities: Atlanta, College Park, East Point, Forest Park, Not City, Panthersville, South Fulton · Funding: GEPA · The project will install automated incident detection devices at 43 existi…

  44. ROADS JAN 22 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0021092: I-75 & I-85 @ 4 LOCS - RAMP METER IMPROVEMENTS

    Construction Work Program · ITS · Cities: Kennesaw, Not City, South Fulton, Union City · Funding: GEPA · The project proposes increasing capacity to improve queuing caused by the ramp meter, as well as upgrading the curr…

  45. ROADS JAN 02 2025 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M004462: I-285 SB @ I-85 NB & SB IN FULTON CO - OVERHEAD SIGNAGE

    Construction Work Program · Signing · Cities: College Park · QUICK RESPONSE PROJECT: REMOVAL OF EXISTING SIGN AND SIGN STRUCTURE (HR0001) AND INSTALLATION OF NEW SIGN AND SIGN STRUCTURE FOR THE I 285 SB RAMP TO I 85 NB &…

  46. ROADS JAN 01 2025 · FULTON · CITY OF JOHNS CREEK TRANSPORTATION PROJECTS

    Johns Creek transportation project: Bridge Replacement (map feature 11)

    Project type: Bridge Replacement. Construction year stated: 2025.

  47. ROADS DEC 26 2024 · FULTON · GEORGIA DOT PROJECT HUB

    Road project M005878: SR 400 @ JUSTIN C MARTIN BUILDING - TUNNEL BRIDGE REHAB

    Under Construction · Bridges · Cities: Atlanta · Funding: NEPA · This work involves developing plans for Tunnel rehabilitation which consists of the following items: Spall repair of transfer beams and the roof slabs, rep…

  48. ROADS DEC 26 2024 · FULTON · GEORGIA DOT PROJECT HUB

    Road project 0009727: SR 8 FROM MARIETTA BLVD TO STRONG ST/NORTHYARD DR

    Construction Work Program · Utility Relocation · Cities: Atlanta · Funding: NEPA · SR 8 FROM MARIETTA BLVD TO STRONG ST/NORTHYARD DR